亚洲欧美日产综合在线|欧美牲交a欧美牲交|国产高清一区不卡|久久精品国产成人av|国产午夜三级一区二区三

EN | 中文
Export Sales
Contact Us
Korea, Japan, India, Pakistan, Nepal, Bangladesh, Sri Lanka, Singapore, Malaysia, Thailand, Mongolia
  • WechatWhatsApp
    Ashley Quan

    Cell : +86 139 10174313Tel: +86 10 89411982Fax: +86 10 89411980Email: asia@hjglass.com.cn

South America, Australia, North America, Philippines, Myanmar, Indonesia, Cambodia, Vietnam
  • WechatWhatsApp
    Julie Wu

    Cell : +86 138 26203956Tel: +86 10 89411982Fax: +86 10 89411980Email: am-aus@hjglass.com.cn

Middle East, Europe, Africa
  • WechatWhatsApp
    Sami Zhang

    Cell : +86 138 10073939Tel: +86 10 89411982Fax: +86 10 89411980Email: sales@hjglass.com.cn

After-Sale Service
  • China Domestic Office Liu Lin

    Tel: 010-89411972 / 73
    Fax: 010-89411975
    Email: service@hjglass.com.cn

  • Export Department Amy Guan

    Tel: +86 10-89411982
    Fax: +86 10-89411980
    Email: hhj@hjglass.com.cn

    WhatsApp Wechat
Common Problem
  • QRoutine Maintenance for Press Machine

    A1. Clean up the sundries on the equipment surface and around in time to keep the working environment clean and tidy
    2. Replace seriously worn or damaged parts in time to avoid equipment failure caused by part failure
    3. Wipe the dust on the suction cup surface and photoelectric sensor surface with a rag every day
    4. Check whether the circuit and air circuit plug connections are firmly connected once a week
    5. Check whether the bolts of moving parts are loose and fall off once a week
    6. Lubricate and maintain moving parts once a month (gear, rack, sprocket, chain, guide rail, etc.)
    7. Clean the dust of the electric control cabinet with a vacuum cleaner once a month (it is strictly prohibited to blow the electrical components directly with compressed air)
    8. Clean the dust on the equipment surface once a month
    9. It is recommended to contact the manufacturer and send professional after-sales personnel to carry out full maintenance of the equipment once a year

    +-
  • QRoutine Maintenance for Washing Machine

    A1. Clean up the sundries on the equipment surface and around in time to keep the working environment clean and tidy
    2. Replace seriously worn or damaged parts in time to avoid equipment failure caused by part failure
    3. Wipe the dust on the suction cup surface and photoelectric sensor surface with a rag every day
    4. Check whether the circuit and air circuit plug connections are firmly connected once a week
    5. Check whether the bolts of moving parts are loose and fall off once a week
    6. Lubricate and maintain moving parts once a month (gear, rack, sprocket, chain, lead screw, guide rail, etc.)
    7. Clean the dust of the electric control cabinet with a vacuum cleaner once a month (it is strictly prohibited to blow the electrical components directly with compressed air)
    8. Clean the dust on the equipment surface once a month
    9. It is recommended to contact the manufacturer and send professional after-sales personnel to carry out full maintenance of the equipment once a year

    +-
  • QRoutine Maintenance for Spacer Bending Machine

    A1. Clean up the sundries on the equipment surface and around in time to keep the working environment clean and tidy
    2. Replace seriously worn or damaged parts in time to avoid equipment failure caused by part failure
    3. Wipe the dust on the suction cup surface and photoelectric sensor surface with a rag every day
    4. Check whether the circuit and air circuit plug connections are firmly connected once a week
    5. Check whether the bolts of moving parts are loose and fall off once a week
    6. Lubricate and maintain moving parts once a month (guide rail, etc.)
    7. Clean the dust of the electric control cabinet with a vacuum cleaner once a month (it is strictly prohibited to blow the electrical components directly with compressed air)
    8. Clean the dust on the equipment surface once a month
    9. It is recommended to contact the manufacturer and send professional after-sales personnel to carry out full maintenance of the equipment once a year

    +-
  • QRoutine Maintenance for Desiccant Filling Machine

    A1. Clean up the sundries on the equipment surface and around in time to keep the working environment clean and tidy
    2. Replace seriously worn or damaged parts in time to avoid equipment failure caused by part failure
    3. Clean the butyl glue that may remain on the surface of structures related to glue supply and blocking every day
    4. Check whether the circuit and air circuit plug connections are firmly connected once a week
    5. Check whether the bolts of moving parts are loose and fall off once a week
    6. Lubricate and maintain moving parts once a month (gear, rack, sprocket, chain, lead screw, guide rail, etc.)
    7. Clean the dust of the electric control cabinet with a vacuum cleaner once a month (it is strictly prohibited to blow the electrical components directly with compressed air)
    8. Clean the dust on the equipment surface once a week (especially the molecular sieve dust attached to the exposed shaft rod of the cylinder)
    9. It is recommended to contact the manufacturer and send professional after-sales personnel to carry out full maintenance of the equipment once a year

    +-
  • QRoutine Maintenance for Butyl Extruder

    A1. Clean up the sundries on the equipment surface and around in time to keep the working environment clean and tidy
    2. Replace seriously worn or damaged parts in time to avoid equipment failure caused by part failure
    3. Check whether the circuit and air circuit plug connections are firmly connected once a week
    4. Check whether the bolts of moving parts are loose and fall off once a week
    5. Clean the dust of the electric control cabinet with a vacuum cleaner once a month (it is strictly prohibited to blow the electrical components directly with compressed air)
    6. Clean up the butyl rubber that may remain in the rubber nozzle, conveyor belt, auxiliary pressure roller and other structural parts in time
    7. It is recommended to contact the manufacturer and send professional after-sales personnel to carry out full maintenance of the equipment once a year

    +-
  • QPLC

    A1. Dust removal shall be carried out every week. During dust removal, the power supply of the control system shall be turned off, and the dust on the surface shall be cleaned with a vacuum cleaner.
    2. Check the connection of I / O modules every week to ensure that all sockets, terminal boards and modules are well connected and firmly placed. When the environment of PLC control system is often subject to vibration that makes the terminal connection loose, this inspection should be carried out frequently;
    3. Check the PLC battery every week: the random access memory (RAM), counter and auxiliary relay with holding function stored in the PLC are protected by lithium battery. The service life of lithium battery is about 5 years. When the voltage of lithium battery gradually decreases to a certain extent, the battery voltage reduction indicator on the PLC basic unit is on. Remind the user that the program supported by lithium battery can be retained for about a week, and the battery must be replaced.
    For example, there is a "bat" red LED indicator on the CPU module of the PLC. When this led is on, it indicates that the service life of the lithium battery in the PLC is almost over (it can last about one week at most). At this time, please replace the new lithium battery as soon as possible to avoid the automatic disappearance of the program in the PLC (when ram is used).

    +-
  • QElectric Machinery

    A1. Dust removal shall be carried out every week. During dust removal, the power supply of the control system shall be turned off, and the dust and oil sludge outside the motor base shall be removed in time.
    2. Check whether the motor operates normally every week without abnormal noise and heating.
    3. Check whether the wiring screws of the junction box are loose and burned every week.
    4. Weekly insulation inspection. During the use of the motor, the insulation resistance shall be checked frequently, and attention shall be paid to check whether the grounding of the motor shell is reliable.
    5. For the maintenance and repair of the motor cooling fan every week, the dust or foreign matters on the cooling fan shall be cleaned in time to prevent the abnormal temperature rise of the motor caused by the abnormal operation of the fan.

    +-
  • QEncoder

    ACheck whether the encoder signal is normal and whether the encoder coupling is loose every week. If it is loose, replace the coupling in time or replace the encoder. If the encoder signal fails, the inflatable partition will collide with the glass and damage the partition.

    +-
  • QTravel Switch

    ACheck whether the signals of all travel switches are normal every week. The travel switch is used for mechanical travel limit or zero positioning, which can be verified by the input and output signals of PLC or touch screen. If there is any problem, please replace it in time.

    +-
  • QSensor

    A1. Check whether the signals of all sensors are normal every week, which can be verified by the input and output signals of PLC or touch screen. If there is any problem, please replace it in time.
    2. Dust removal shall be carried out every day. If there is floating dust on the surface of the touch screen, please wipe it with a clean anhydrous cloth. Do not wipe it with ethanol, gasoline and other organic solvents.
    3. Check whether the fastening nuts of all sensors and the fasteners of sensor support are loose every week. If there are problems, adjust and retighten them in time.

    +-
  • QTouch Screen

    ADust removal shall be carried out every day. If there is floating dust on the surface of the touch screen, please wipe it with a clean anhydrous cloth. Do not wipe it with ethanol, gasoline and other organic solvents.

    +-
  • QCheck the Power Supply Voltage Regularly

    ACheck the power supply voltage every week;
    3P 380V / 1p + n 220V, according to national regulations, its fluctuation range is ≤ 10%.
    24V power supply, fluctuation amplitude ≤ 5%

    +-
  • QLow Voltage Electrical Parts Of Control Cabinet

    ADust removal shall be carried out every week. During dust removal, the power supply of the control system shall be turned off, and the dust on the surface shall be cleaned with a vacuum cleaner.

    +-
  • QFrequency Converter, Servo Driver

    ADust removal shall be carried out every week. During dust removal, the power supply of the control system shall be turned off, and the dust on the surface shall be cleaned with a vacuum cleaner.
    The parameters of frequency converter and servo driver have been set before leaving the factory. Do not change the parameters of frequency converter without authorization, otherwise the equipment will not operate normally.

    +-
  • Online Message

  • +86 10 89411982
  • 主站蜘蛛池模板: 精品熟妇视频一区二区三区| 亚洲精品无码成人a片蜜臀| 成人一区二区网站| 我把护士日出水了视频90分钟| 综合色天天鬼久久鬼色| 成人国产一区二区三区精品麻豆| 国产一区内射最近更新| 国产丝袜自拍一区| 色视频www在线播放国产人成| 色一区,二区,三区| 国精产品48x国精产品| 国产日产精品一区二区| 一区在线观看高清视频| 亚洲一区二区三区无码中文字幕 | 久久久久人妻精品一区二区三区| 国产 欧美 视频一区二区| 日本高清视频www夜色资源| 88av一区二区三区| 免费无码久久成人影片| 99久久无码一区人妻a黑| 欧美人与动牲交欧美精品| 熟妇人妻中文字幕| 国产日产精品一区二区| 成人亚洲性情网站www在线观看| 一区二区三区在线 | 欧洲| 成人高潮视频在线观看| 精品国产v无码大片在线看| 亚洲日本中文字幕天天更新 | 成人无码av片在线观看| 色综合久久一区二区三区| 亚洲日韩乱码中文无码蜜桃臀| 国产成人精品日本亚洲直播| 色欲av无码一区二区三区 | 永久不封国产av毛片| 午夜福利视频国产一区| 欧美性猛少妇xxxxx免费| 色噜噜av男人的天堂| 国产一级一区二区三区| 99人妻精品日韩欧美一区二| 女人被狂躁c到高潮喷水一区二区| 最新日韩精品中文字幕|